EPC of hydro mechanical and electrical equipment of Syahoo dam project
SIAHOO Dam – EPC Contract
Mechanical, Electrical, Instrumentation and Control systems
LIST OF MECHANICAL EQUIPMENTS
- Diversion stoplogs
- Intake stoplogs
- Bottom outlet pipe DN1000 mm
- Irrigation pipe DN900 mm
- Service and emergency slide gates
- Hydraulic jack 50 tons
- Intake trashracks
- Butterfly valve DN1000, PN16
- Howell bunger valve DN800, PN10
- two overhead traveling crane 3 and 5 tons
- Bellmouth, transitions and reducers
LIST OF ELECTRICAL EQUIPMENTS
- One MDB panel
- Two SDB panels
- Diesel generator 100 KVA
- Cabling
- DC system
- Earthling system
- Instrumentation (Flow meters, turbidity measuring, pressure transmitters, level meters)
- Dam crest lighting
MONITORING SYSTEM
- Scada pc based system
- Mimic system
Client: South khorasan regional water authority
Consultant: Mahar ab consultant engineering Co.
Hydromechanical Contractor: Sazab sanat pajouh Co.
Type of contract: EPC
Cost: 3,000,000 USD